POWER EXPECTATIONS · PUERTO RICO
800 MW · NEW SOUTH-COAST GENERATION · UNDER CONSTRUCTION
We’re bringing 800 megawatts of new, reliable generation onto Puerto Rico’s grid — the steady power the island has gone too long without.
01 MOBILIZE
A conventional power plant takes years to build. Ours is modular — engineered to be delivered, deployed, and producing power in a fraction of that time. When a grid can’t wait, that speed matters.
02 ARRIVE
The fleet stages at Puerto Rico’s south-coast generating sites — integrated into the existing network, feeding capacity into the lines that carry power across the island.
03 DEPLOY
Every unit is set, fueled, and connected to exacting standards. Not a stopgap — durable, permanent-grade infrastructure, installed with the discipline critical power demands.
04 ENERGIZE
The units synchronize to the grid, the breakers close, and new capacity flows onto the lines — dispatchable power, ready the moment Puerto Rico needs it.
05 RESTORE
Steady, dependable electricity for the homes, hospitals, water systems, and businesses that keep Puerto Rico running.
Power Expectations — reliable power for Puerto Rico.
Building the power Puerto Rico can build its future on.
Modeled on Puerto Rico’s real 230 / 115 kV network and south-coast generation. The 800 MW fleet is a proposed deployment — after Hurricane Maria, emergency mobile turbines were running 17 days after the contract was signed.